- Materials
- Weather
- Workers
The weather turned our usual bit of Fall rain into a persistent downpour, keeping everything soaked including the road. Also, the company that supplied our steel did not cut part of the building right; holes where missing, slots uncut, etc. They also provided us with extra parts. Their engineer verified that they shipped us pieces that do not go on our building.
All of this amounted to a very lengthy, and in construction as the time frame expands so must the budget, build time. Now on to the pictures.
No comments:
Post a Comment